Wapda canal. This Wapda canal was built in two parts in 1985, on the south side in 180. All areas were flooded by the tide of the river. Considering the plight of the people of the area, the canal was cut and the embankment was constructed so that the tidal water of the river could not harm the locals.
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS